Doddy, Angryawan (2011) Pola Ketersediaan Daya Dari Hybrid Kapasitas 1 KW (EISOL) Menggunakan Pembangkit Listrik Tenaga Bayu (PLTB) dan Pembangkit Listrik Tenaga Surya (PLTS) di Kota Padang (Studi Kasus : Lokasl Daerah Tabing). S1 thesis, Universitas Andalas.
|
Text (Full Text)
S1 Teknik Elektro 2011 Doddy Angryawan 05175019.pdf - Published Version Restricted to Repository staff only Download (8MB) |
| Item Type: | Thesis (S1) |
|---|---|
| Subjects: | T Technology > T Technology (General) T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Teknik > S1 Teknik Elektro |
| Depositing User: | TID Rafiqatul Fikri |
| Date Deposited: | 26 Nov 2025 08:39 |
| Last Modified: | 26 Nov 2025 08:39 |
| URI: | http://scholar.unand.ac.id/id/eprint/515751 |
Actions (login required)
![]() |
View Item |

["Plugin/Screen/EPrint/Box/Plumx:title" not defined]
["Plugin/Screen/EPrint/Box/Plumx:title" not defined]