DETAILED ENGINEERING DESIGN PROYEK PENGGANTIAN SEGMENTAL TIANG LISTRIK JARINGAN DISTRIBUSI TEGANGAN MENENGAH 13.8 KV DI PERTAMINA HULU ROKAN

Fajri, Rully (2024) DETAILED ENGINEERING DESIGN PROYEK PENGGANTIAN SEGMENTAL TIANG LISTRIK JARINGAN DISTRIBUSI TEGANGAN MENENGAH 13.8 KV DI PERTAMINA HULU ROKAN. S2 thesis, Universitas Andalas.

[img] Text (Cover dan Abstrak)
1. Cover&abstract_compressed.pdf - Published Version

Download (164kB)
[img] Text (Bab 1)
2. Bab1_compressed.pdf - Published Version

Download (142kB)
[img] Text (Bab Akhir)
3. Bab akhir_compressed.pdf - Published Version

Download (125kB)
[img] Text (Daftar Pustaka)
4. Daftar Pustaka_compressed.pdf - Published Version

Download (114kB)
[img] Text (Tugas Akhir)
5. Tugas Akhir_compressed.pdf - Published Version
Restricted to Repository staff only

Download (5MB) | Request a copy

Abstract

This Detailed Engineering Design includes the design for the replacement of existing 13.8 kV distribution poles that have substandard or damaged reliability and integrity and the replacement of all necessary accessories including equipment attached to the segmental poles such as ACSR (Conductor), distribution transformers, load breakers, reclosers and capacitor banks. This study contains Electrical, Civil and QA/QC disciplines to produce related results such as design basis, one line diagram, datasheet, standard installation drawings, power line layout drawings, material take off and procedures needed to support construction implementation. According to the scope of work, the selection of areas that will be part of the replacement of the poles will be divided into 3 areas, namely the Duri HO, Bangko and Batang areas. Detailed engineering design is carried out based on input data from the Assest integrity and reliability team regarding which segments need to be replaced in the three areas. Site surveys are carried out to support the data needed in carrying out detailed engineering design such as taking coordinate data, plotting the position of new poles, including interfaces with existing facilities such as existing pipelines, existing electricity poles, buildings and other public facilities. To facilitate the implementation of the construction of the installation of new segmental electric poles, this detailed engineering design also carried out a constructability workshop and also a SAFOP (Safety and operability) workshop as an effort to reduce facility shutdowns that can result in loss of crude oil production or LPO (Loss production opportunities). Keywords: Detailed Engineering Design, Pertamina Hulu Rokan, Electric Poles, Safety & Operability, Loss production opportunities.

Item Type: Thesis (S2)
Supervisors: Prof. Dr. Ir. Bambang Istijono, M. Eng, IPU PROGRAM
Uncontrolled Keywords: Detailed Engineering Design; Pertamina Hulu Rokan; Electric Poles; Safety & Operability; Loss production opportunities
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Pascasarjana (S2) > Pendidikan Profesi Insinyur
Depositing User: Profesi Insinyur insinyur
Date Deposited: 25 Jan 2025 01:25
Last Modified: 25 Jan 2025 01:25
URI: http://scholar.unand.ac.id/id/eprint/487774

Actions (login required)

View Item View Item