Perancangan Sistem Plambing Perpustakaan Daerah Kuantan Singingi

Tiara, Annisa Irdanela (2023) Perancangan Sistem Plambing Perpustakaan Daerah Kuantan Singingi. Diploma thesis, Universitas Andalas.

[img] Text (Cover dan Abstrak)
1. Cover dan Abstrak.pdf - Published Version

Download (404kB)
[img] Text (BAB 1)
2. BAB 1.pdf - Published Version

Download (244kB)
[img] Text (BAB 9 Penutup)
3. BAB 9.pdf - Published Version

Download (343kB)
[img] Text (Daftar Pustaka)
4. Daftar Pustaka.pdf - Published Version

Download (438kB)
[img] Text (Tugas Akhir Full Text)
5. Tugas Akhir Full Text.pdf - Published Version
Restricted to Repository staff only

Download (55MB)

Abstract

The Kuantan Singingi Regency and Riau Province governments erected the Kuantan Singingi Regional Library to improve the quality of community literacy. This library is located in Jalan H Abdoer Rauf and has 4 floors. The plumbing systems design for the building includes water supply systems, sewerage distribution systems, vent systems, rainwater distribution systems, and fire hazard prevention systems. The design of plumbing systems based on SNI 8153:2015 concerning Plumbing Systems in Buildings as well as other standards and regulations related. The water supply system uses a roof tank system with a water source from a deep drilled well. The tanks used 3 FRP tanks and 2 compartment bottom tanks. A booster pump with Np = 0.43 kW and Nm = 0.51 kW is needed in the distribution piping. The sewerage distribution system divided into dirty water distribution system and used water distribution system which designed separately. Wastewater channeled into 2 bio septic tanks with a capacity of 30 m3. Vent systems used are individual vents, circuit vents, shared vents, loop vents, and branch vents. The rainwater distribution system had a different piping system from wastewater. Rainwater is channeled through horizontal pipes and vertical pipes to the infiltration field with a channel length of 3 m. The library classified as a building with moderate fire hazard group II. The fire prevention system used hydrant system, 1 unit per floor, and a sprinkler system. The drinking water supply system used PVC pipes with a diameter of 32 mm – 75 mm. The dirty water and used water distribution system uses PVC pipes with diameters of 63 mm – 110 mm and 32 mm – 50 mm respectively. The rainwater distribution system used PVC supralon pipes with diameters of 50 mm and 75 mm. The fire prevention system uses 25 mm – 100 mm GIP pipes. The total costs required for the plumbing system work project in the Kuantan Singingi Regional Library building are Rp.2,800,000,000.00-, (Two Billion Eight Hundred Million Rupiah).

Item Type: Thesis (Diploma)
Primary Supervisor: Dr. Eng. Ir. Denny Helard
Uncontrolled Keywords: Building, design details, library, plumbing system.
Subjects: T Technology > TD Environmental technology. Sanitary engineering
Divisions: Fakultas Teknik > Lingkungan
Depositing User: s1 teknik lingkungan
Date Deposited: 27 Feb 2024 03:05
Last Modified: 27 Feb 2024 03:05
URI: http://scholar.unand.ac.id/id/eprint/462299

Actions (login required)

View Item View Item